Option 1 - 4-lane structure
The PELS recommended four lanes of travel through segment 1, which is the section that encompasses the Snake River Bridge. Option 1 provides a cost effective four lane bridge while trying to minimize the overall footprint.
Option 1 - Raised median
Option 2 increases the overall footprint of the bridge and preliminary estimates indicate this would add $4,000,000 to the bridge cost of option 1.
Option 3 - Separate Structures
Option 3 increases the overall footprint of the bridge and preliminary estimated indicate this would add $2,200,000 to the bridge cost of option 1.